TECHNIP SINGAPORE EXPSNSION PROJECT – LOCATION: SINGAPORE
Singapore Expansion Project
Location: Singapore
Project Overview
Year: 2019
Client: Technip
Project Name: Singapore Expansion Project
Location: Singapore
Work Done
Key activities performed included:
- Arrangement of equipment and issuance of general and area plot plans with sections
- Study of the pipe rack and major piping layout
- Development of the 3D model starting from the one developed by the customer at 30% using SP3D
- Model review at 60% and 90%
- Comments on vendor drawings for equipment, checking nozzle orientation and maneuvering spaces
- Comments on P&IDs
- Preliminary and final MTOs
- Extraction of piping and isometric plans with verification
- Interface with other disciplines
- Stress analysis activities, including calculations and reports
- List and collection of supports with relative MTO and insertion of supports in the model
- Detail Engineering activities